ArcGIS REST Services Directory Login
JSON

Legend (HS2AWS/Engineering_Layers)

Soil translocation areas (0)
Test piling site (1)
Planting sites and access routes (2)
Access Route - EWC Access Route - EWC
Planting Area - EWC Planting Area - EWC
Access Route - MWCC Access Route - MWCC
Planting Area - MWCC Planting Area - MWCC
Scope of vegetation clearance (C2) (3)
High High
Medium Medium
HS2 Scope HS2 Scope
Scope of vegetation clearance (C3) (4)
High High
Medium Medium
HS2 Scope HS2 Scope
High Speed Railways Alignment (6)
Rail Alignment Formation (7)
Tunnel Excavated Extent (8)
Bottom of slope (rail) (10)
Bottom of slope (non-rail) (11)
Symbols (non-rail) (12)
Symbols (rail) (13)
Top of slope (rail) (14)
Top of slope (non-rail) (15)
Deposition excavated materials (16)
Earthworks profiling construction sites (17)
Earthworks profiling satellite construction compound (18)
Foundations (non-rail) (19)
Foundations (rail) (20)
Infrastructure mitigation earthworks (21)
Stockpile (22)
Temporary earthworks stockpile (23)
Construction traffic route (25)
Satellite construction compounds (26)
Main construction compounds (lot 2) (27)
Satellite construction compounds (lot 2) (28)
Main construction compounds (29)
Retaining wall (30)
Electricity substations (32)
System railheads (33)
Portal (34)
Shaft (35)
Cross passage (36)
Noise barriers (38)
Hedgerow habitat creation (39)
Hedgerow habitat creation (landscape) (40)
Ecologica mitigation pond (41)
Landscape mitigation planting (42)
Woodland habitat creation (43)
Wetland habitat creation (44)
Grassland habitat creation (45)
Retained vegetation (46)
Watercourse diversion (48)
Watercourses (49)
Ditch (new) (50)
Flood compensation areas (existing) (51)
Balancing pond (52)
Flood compensation areas (new) (53)
Attenuation pond (new) (54)
Flood extent (100 year) (55)
Public right of way (new) (57)
Road - verge (58)
Access road (on-site) (59)
Raod - edge of crriageway (60)
Footpath (61)
Public right of way (existing) (62)
Public right of way (stopped up - permanent) (63)
Public right of way (stopped up - temporary) (64)
Road - hard shoulder (65)
Electrical (new) (67)
Electrical HV (modified) (68)
Electrical HV (new) (69)
Electrical (existing) (70)
Electrical LV (existing) (71)
Electricity (temporary) (72)
Fuel (existing) (73)
Fuel (modified) (74)
Gas (modified) (75)
Gas MP-LP (modified) (76)
Gas (new) (77)
Telecommunications (new) (78)
OH HV cables (existing) (79)
Sewer pipe conections (80)
Water mains (small, existing) (81)
Electrical LV (modified) (82)
Water mains (modified) (83)
Sewers (large, modified) (84)
Telecommunications (modified) (85)
Telecommunications ducts (modified) (86)
Gas PRS (modified) (87)